Welcome to the CHEMWIN
Trading Time : 09:30-17:00 GMT+8
Customer Service line : +86 400-9692-206
(09:30-18:00 GMT+8)
Inquire NowRead: 833 Time:14months ago Source:Transform the World with Simplicity
Driving a vehicle into the chemical plant area is a task that requires special attention because it is full of various hazards and safety hazards. The following are some important driving precautions, hoping to help drivers be vigilant and ensure safe and smooth entry into the chemical plant area.
1. Understand the road conditions
Before entering the chemical plant area, be sure to understand the road conditions in advance, including road conditions, traffic conditions and special road signs. This can help the driver to prepare for the unexpected.
2. Drive carefully After entering the chemical plant area, the
must drive carefully, abide by traffic rules, and strictly abide by the speed limit requirements. Chemical plant areas usually have a strict safety monitoring system, and violations will be severely punished.
3. pay attention to signs
chemical plant area is usually set up a variety of safety warning signs and signs, the driver in the process of driving must pay special attention to these signs, and strictly abide. These signs are set to ensure the safety of the area.
4. Pay attention to the surrounding environment
must always pay attention to the surrounding environment during driving, pay attention to the movements of other vehicles and pedestrians, and ensure that their driving behavior will not bring danger to others.
5. Comply with safety regulations There are usually strict safety regulations and operating procedures in the area of
chemical plants. Drivers must strictly abide by these regulations and are not allowed to stop or change the driving route without authorization.
The above are some drivers need to pay special attention to when entering the chemical plant area. I hope every driver can strictly abide by them and do a good job of safety precautions to ensure the safety of themselves and others.
Cyclical fluctuations in the chemical industry, when will the next boom cycle come?
Jihua 240000 Tons Bisphenol A Plant Successfully Completed Mechanical Completion, Industry Shuffle Accelerated?
The total budget is 2.328 billion yuan, and the 100000-ton BDO and 120000-ton PBAT projects in Anhui have been successfully fed.
Nanjing Jiangbei pilot base started! Nanjing Chengzhi MMA pilot project settled in!
With a total investment of 1.024 billion yuan, 240000 tons/year of polyether is diversified and delivered smoothly.
Longnan Xintao Project Expansion EIA Publicity, New 20000 Tons of PMMA Capacity
Quick Response
Customer service is available 24/7 for extremely fast response
Exclusive Services
Dedicated consultant 1 to 1 service
Massive Resources
Connecting resources upstream and downstream
Technology Advanced
Technology Information Service
Transaction Security
Merchant authentication and risk control model
One-stop service
Trading logistics warehouse-style services