Welcome to the CHEMWIN
Trading Time : 09:30-17:00 GMT+8
Customer Service line : +86 400-9692-206
(09:30-18:00 GMT+8)
Inquire NowRead: 297 Time:7months ago Source:Transform the World with Simplicity
Before the test run of chemical equipment, it is necessary to make relevant preparations and precautions to ensure the smooth progress of the test run and the safety of personnel.
must conduct a comprehensive inspection of the equipment before commissioning, including the operating parts, seals, electrical systems, etc. of the equipment, to ensure that all parts are in good condition. At the same time, it is also necessary to check whether the safety protection devices of the equipment, including the emergency stop button and the safety door, are in good condition and effective. Before the test run, the test run area must be cleaned and kept clean to avoid accidents caused by clutter or dust accumulation. The commissioning personnel shall strictly abide by the relevant operating procedures and shall not modify the equipment parameters or operating procedures without authorization. During the commissioning process, pay close attention to the operation of the equipment. Once an abnormal situation is found, stop the machine immediately for inspection and report to the relevant person in charge in time.
Before the test run, the
must do a good job of safety protection, including dress code, wearing safety helmet, goggles, etc. After the test run, the equipment shall be cleaned and maintained in time to ensure that the equipment is in good condition.
Before the test run of chemical equipment, the
should strictly abide by the operating procedures, take safety protection measures, and comprehensively inspect the equipment to ensure the safety and reliability of the test run process.
2024 Polycarbonate PC Industry Market Event
Acrylonitrile price shocks down, when can the imbalance between supply and demand be solved?
New trends in the bisphenol A market: raw material acetone rose, downstream demand is difficult to boost
With a total investment of 1.024 billion yuan, Sinochem Dongda (Quanzhou) Polyether Polyol Signed
Epoxy resin market after the National Day, the price rise can be sustained?
Total investment 1.5 billion, Hebei Jinbang new materials 80000 tons of epoxy resin project accelerated
Quick Response
Customer service is available 24/7 for extremely fast response
Exclusive Services
Dedicated consultant 1 to 1 service
Massive Resources
Connecting resources upstream and downstream
Technology Advanced
Technology Information Service
Transaction Security
Merchant authentication and risk control model
One-stop service
Trading logistics warehouse-style services