[Chemical Knowledge]:Pump combined test run, precautions and steps

Pump combined test run is a very critical link in the construction of the project, and its improper conduct will have a great impact on the follow-up project. Therefore, in the pump joint test run, need to pay attention to the following matters and steps:

1. preparation:
1. check the pump station equipment, confirm whether the installation meets the requirements, to ensure that the pump station and pipeline system intact.
2. Check the electrical system to ensure that the equipment is connected reliably, all kinds of instruments are complete, and the earth leakage protection is connected.
3. Check the piping system to confirm whether the position of each valve, indicator and equipment connection meet the design requirements and make adjustments.
4. Check the water injection system to ensure that the water injection pump and pipelines are unobstructed, and conduct a comprehensive inspection of the water injection device.

2. commissioning operation steps:
1. Open the main pump: first ensure that the pump station and pipeline system are in normal working condition, then open each main pump in sequence, observe the operation status of the pump station and pipeline system, and confirm its normal operation.
2. Stop pump inspection: After the pump station has been operating normally for a period of time, it is necessary to stop the pump station equipment and conduct a comprehensive inspection of the pump station to confirm whether the equipment is operating normally.
3. Debugging parameters: After confirming that the pumping station equipment is operating normally, the equipment needs to be debugged, including the outlet pressure, flow rate, operating parameters, etc. of each main pump for debugging and recording.
4. Joint commissioning: after the commissioning of the operating parameters of each main pump is completed, joint commissioning is required to ensure the coordination of each main pump and the stable operation of the pump station.
5. Confirm commissioning: After all pumping station equipment is operating normally, it is necessary to confirm the commissioning results and record the commissioning data, including various parameters and operating status.
Precautions for
3.:
1. Strictly follow the commissioning operation steps, and it is forbidden to operate the pumping station equipment at will.
2. Pay attention to safety issues to avoid accidents caused by improper commissioning operation.
3. During the test run, strictly control the parameters to ensure the stability and safety of the test run.
4. Pay attention to the running status of equipment, and find and deal with equipment faults in time. Through the above precautions and operation steps, the

hopes to help the construction personnel to better complete the pump joint test run and ensure the stability and safety of the pump station equipment operation. At the same time, it also reminds everyone that when carrying out the test run, it must be carried out in strict accordance with the requirements, and do not be careless to ensure the smooth progress of the test run.

  • 化易天下咨询

    Quick Response

    Customer service is available 24/7 for extremely fast response

  • 化易天下销售

    Exclusive Services

    Dedicated consultant 1 to 1 service

  • 化工品交易市场

    Massive Resources

    Connecting resources upstream and downstream

  • B2B化工交易

    Technology Advanced

    Technology Information Service

  • 化工贸易金融服务

    Transaction Security

    Merchant authentication and risk control model

  • 化工仓储服务平台

    One-stop service

    Trading logistics warehouse-style services